BOMBARDIER C SERIES, rival to the smaller Airbus 320 series and Boeing 737 “next generation” aircraft, is progressing on time with a scheduled for service date set for 2013. The first major test module, a fuselage trial barrel, has been delivered to Bombardier's Saint-Laurent, Quebec, facility from Shenyang Aircraft Corporation of China. Just over 10% of the C Series aircraft will be manufactured in China by Shenyang Aircraft Corporation.
Another recent achievement for the C Series aircraft programme included the successful completion of a series of wind tunnel tests covering high speed, low speed and high lift. These were carried out at various facilities including, ONERA F1 (Toulouse, France), ETW (Cologne, Germany) and ARA (Bedford, UK). To date Bombardier has announced orders for 50 aircraft.
Source: AERBT
Progress on Bombardier C Series
Moderator: Latest news team
Progress on Bombardier C Series
André
ex Sabena #26567
ex Sabena #26567
-
chornedsnorkack
- Posts: 428
- Joined: 21 Oct 2005, 00:00
Cseries wing mated with box!
See
http://www.flightglobal.com/articles/20 ... -wing.html
Is the said... beast with two backs due for incorporation into an airworthy frame, or purely a test assembly?
http://www.flightglobal.com/articles/20 ... -wing.html
Is the said... beast with two backs due for incorporation into an airworthy frame, or purely a test assembly?