B787 photo release

Join this forum to discuss the latest news that happened in the world of commercial aviation.

Moderator: Latest news team

Post Reply
User avatar
CTBke
Posts: 1141
Joined: 13 May 2003, 00:00
Location: Newark NJ

B787 photo release

Post by CTBke »

EVERETT, Wash., May 21, 2007 -- Final assembly of the all-new Boeing [NYSE: BA] 787 Dreamliner began today with a ceremony in Everett, Wash.

"Today we begin assembling the first airplane of a new generation," said Scott Strode, 787 vice president of Airplane Definition and Production. "The 787 not only will revolutionize air travel, it represents a new way of building airplanes."

With 568 firm orders from 44 airlines, the 787 is the fastest-selling new airplane in aviation history. The 787 production system was designed using Lean manufacturing techniques in a simplified final assembly process.

"The 787 production system is the culmination of the lessons we've learned building previous airplanes," said Steve Westby, 787 vice president of Manufacturing and Quality. "Using composites on the 787 airframe has a number of manufacturing advantages. We are able to build huge structure in just one piece, which means we essentially have six major end items coming together in final assembly -- the forward, center and aft fuselage sections, the wings, the horizontal stabilizer and the vertical fin. "

Since the 787 is assembled from these large assemblies rather than many smaller pieces, traditional monument assembly tools are not necessary. Portable tools, designed with ergonomics in mind, move the assemblies into place. No overhead cranes are used to move airplane structure.

"A composite airframe also means less waste in production and fewer hazardous materials used during the assembly process," Westby said. "This is good news for the environment and for our team of manufacturing technicians building the airplane."

Although the first airplane will take about seven weeks to assemble, the 787 team looks to continuously improve flow time as production ramps up. Ultimately, a 787 will roll out of the factory every three days.

The first 787 will roll out of the factory on July 8, 2007.

Image
Image
Image

copyright http://www.boeing.com
Citybird
The flying dream

smokejumper
Posts: 1033
Joined: 21 Oct 2005, 00:00
Location: Northern Virginia USA

Post by smokejumper »

Cool! It's finally coming together.

User avatar
David747
Posts: 777
Joined: 11 May 2006, 00:00
Location: Teterboro KTEB, USA

Post by David747 »

That is great to see. Hopefully Boeing will release more pictures in the next couple of days and weeks!

User avatar
vc-10
Posts: 766
Joined: 05 May 2005, 00:00
Location: Under Heathrow flightpath

Post by vc-10 »

Can't wait to see her fly!

RC20
Posts: 547
Joined: 09 Dec 2005, 00:00

Post by RC20 »

smokejumper wrote:Cool! It's finally coming together.
How often do you really get to be around when history is being made?

Go Boeing Go!

joner
Posts: 1
Joined: 02 Feb 2004, 00:00

Post by joner »

Ultimately, a 787 will roll out of the factory every three day
This is just amazing! How long does it take to assemble an A380 ?? This is where Airbus has to improve in the future...

Post Reply